Below is a RAMS document for planters in parks and public areas, covering delivery, positioning, filling, planting, watering, maintenance and public safety.
Installation, Planting and Maintenance of Whisky Barrel Planters
1. Scope of work
This RAMS covers the safe installation and ongoing maintenance of whisky barrel planters placed around Corstorphine as part of Corstorphine in Bloom.
The work may include:
- receiving whisky barrel planters
- moving planters short distances into position
- checking the site and ground surface
- filling planters with compost or soil
- adding plants
- watering
- weeding and maintenance
- removing waste, packaging or surplus soil
- keeping paths and public areas safe during work
This RAMS does not cover work on live roads, work requiring excavation, work at height, electrical work, use of powered machinery, or any activity requiring formal traffic management.
2. People involved
The activity may involve:
- Corstorphine in Bloom volunteers
- Friends of local parks groups
- Council officers or contractors
- members of the public passing through the park
- children and families using the park
- dog walkers
- cyclists or mobility scooter users where paths are nearby
Children may help with suitable low-risk planting tasks only when supervised by a parent, carer or responsible adult.
3. Key principles
All volunteers should:
- only do work they feel comfortable doing
- stop if something appears unsafe
- ask for help with heavy or awkward tasks
- wear suitable footwear and gloves
- keep paths clear
- avoid obstructing the public
- report hazards, accidents or near misses to the organiser
No task is urgent enough to justify someone getting hurt.
PART A: RISK ASSESSMENT
4. Risk rating guide
Likelihood
- Low – unlikely to happen
- Medium – could happen
- High – likely to happen
Severity
- Low – minor injury or inconvenience
- Medium – injury requiring first aid or medical attention
- High – serious injury
Risk rating
Risk rating = Likelihood x Severity
- 1–2 = Low
- 3–4 = Medium
- 6–9 = High
High risks must be reduced before work begins.
5. Risk assessment table
| Hazard | Who may be harmed | Initial risk | Control measures | Residual risk |
|---|---|---|---|---|
| Heavy or awkward lifting of whisky barrel planters | Volunteers | High | Avoid lifting full barrels. Move barrels empty wherever possible. Use two or more people for moving. Use trolley/barrow if available. Do not drag or roll barrels where this may cause loss of control. Volunteers must not lift beyond their capability. | Medium |
| Lifting bags of compost, soil, plants or water containers | Volunteers | Medium | Use smaller bags or split loads where possible. Use wheelbarrow/trolley. Team lift heavy items. Keep loads close to body. Avoid twisting. Make several smaller trips. | Low/Medium |
| Slips, trips and falls | Volunteers and public | Medium | Check work area before starting. Keep tools, bags, plants and waste off paths. Avoid trailing hoses across paths. Take care on wet grass, slopes, mud, leaves and uneven ground. Stop work in unsafe weather or poor ground conditions. | Low |
| Tools causing cuts, punctures or impact injuries | Volunteers, children, public | Medium | Use appropriate hand tools only. Carry tools safely with points down. Do not leave tools lying on paths or grass. Keep tools away from children. Do not use damaged tools. | Low |
| Sharp objects, broken glass, litter or contaminated material | Volunteers | Medium | Wear gloves. Use litter pickers where available. Do not pick up needles, dog mess, chemicals or unknown substances. Report hazardous items to organiser or Council. | Low |
| Soil, compost, splinters or biological material causing irritation or infection | Volunteers | Medium | Wear gardening gloves. Cover cuts. Wash hands after work and before eating or drinking. Avoid touching face while handling soil. Seek advice if a cut becomes infected. | Low |
| Barrel instability, tipping or rolling | Public, children, volunteers | High | Position barrels on firm, level ground. Do not place on steep slopes or unstable ground. Ensure barrels are stable before filling. Once filled, check they cannot easily roll or tip. Do not allow children to climb or sit on barrels. | Low/Medium |
| Obstruction of paths, entrances or desire lines | Public, wheelchair users, prams, cyclists | Medium | Position barrels away from main walking lines unless agreed. Maintain clear access for wheelchairs, prams, mobility scooters and maintenance vehicles. Do not block gates, benches, bins, signs or emergency access. | Low |
| Working near park paths, cycle routes or vehicle access points | Volunteers and public | Medium | Work from safe areas only. Be aware of cyclists, maintenance vehicles and pedestrians. Use hi-viz where the work area is close to paths, entrances or vehicle routes. Keep tools and materials contained. | Low |
| Weather: heat, cold, wind, rain or poor visibility | Volunteers | Medium | Check weather before session. Wear suitable clothing. Bring water. Take breaks. Use sun cream and hats in hot weather. Stop if high winds, lightning, heavy rain, icy conditions or poor visibility make work unsafe. | Low |
| Public interaction, dogs or children entering work area | Volunteers and public | Medium | Keep the work area tidy and visible. Pause work if the public come too close. Be friendly but do not allow unsupervised children to use tools. Keep compost, tools and plants away from dogs and children. | Low |
| Allergic reactions to plants, compost or stings | Volunteers | Medium | Volunteers should avoid plants they know they react to. Wear gloves and long sleeves if sensitive. First aid kit should be available. Call 999 for severe allergic reaction. | Low |
| Watering hazards, heavy containers or wet paths | Volunteers and public | Medium | Use manageable containers. Avoid spilling water on paths. Do not leave hoses across walkways. Coil hoses away after use. Take care on wet surfaces. | Low |
| Lone working | Volunteers | Medium | Avoid lone working for installation and heavy tasks. Maintenance should normally be done in pairs or groups. If working alone, carry a mobile phone, tell someone where you are, and avoid lifting, roadside work or higher-risk tasks. | Low/Medium |
| Manual handling by older volunteers or volunteers with health conditions | Volunteers | Medium | All tasks are voluntary. No one should be pressured to lift, kneel, dig or carry. Offer lighter tasks such as planting, watering small containers, or greeting volunteers. | Low |
| Vehicle delivery of barrels, compost or plants | Volunteers and public | High | Delivery vehicles should use agreed access points only. Keep volunteers and public away from reversing vehicles. Do not unload unless safe to do so. Use banksman/helper if necessary. Follow Council or supplier instructions. | Medium |
| Waste and packaging left on site | Public, wildlife | Medium | Remove packaging, plastic, cable ties and surplus materials at the end of the session. Dispose of waste responsibly. Leave the site tidy and safe. | Low |
6. Personal protective equipment
The following PPE is recommended:
- gardening gloves
- sturdy shoes or boots
- weather-appropriate clothing
- hi-viz vest where working near paths, entrances, traffic, cycles or vehicle access
- kneeling pad or knee protection where useful
- sun hat and sun cream in hot weather
- waterproofs in wet weather
8. Environmental considerations
Volunteers should:
- avoid damaging existing plants, trees, bulbs or wildlife habitats
- avoid placing soil or compost into drains or watercourses
- keep plastic packaging and plant labels out of the park
- use peat-free compost where possible
- consider pollinator-friendly and drought-tolerant planting
- water sensibly and avoid waste
PART B: METHOD STATEMENT
9. Pre-start checks
Before work begins, the organiser should:
- confirm the location of the planters
- check that permission has been agreed where required
- inspect the ground for slopes, holes, soft ground, broken glass or trip hazards
- check that paths and access routes will remain clear
- check weather conditions
- identify where tools, compost, plants and waste will be placed
- brief volunteers on the work and safety points
- confirm that volunteers know they can stop or decline tasks
10. Delivery and unloading
Where barrels, compost or plants are delivered:
- Delivery should use an agreed safe access point.
- Volunteers should stay clear of moving vehicles.
- Nobody should stand behind a reversing vehicle.
- Barrels should be unloaded by the supplier or by competent people using suitable equipment.
- Empty barrels should be moved before filling.
- Full barrels should not be manually lifted.
- Materials should be placed away from paths and public routes.
11. Positioning the whisky barrel planters
- Check that the selected area is level, firm and suitable.
- Make sure the planter will not block paths, entrances, benches, bins or emergency access.
- Move barrels empty wherever possible.
- Use two or more people if the barrel needs to be lifted or shifted.
- Use a trolley, sack barrow or wheelbarrow if available.
- Do not roll a barrel where it could run away or hit someone.
- Once positioned, check that the barrel is stable and does not rock, roll or tip.
- If the location is unsuitable, stop and choose another agreed location.
12. Filling the planters
- Place compost and soil bags close to the planter to avoid unnecessary carrying.
- Use smaller loads where possible.
- Cut bags carefully using suitable hand tools.
- Volunteers should avoid overfilling buckets or containers.
- Fill gradually and check stability as the weight increases.
- Keep the surrounding area clear of spilled compost.
- Do not leave empty bags or tools where people may trip.
13. Planting
- Volunteers should wear gloves.
- Use hand tools suitable for the task.
- Keep tools within the work area and away from paths.
- Children may help only with safe planting tasks and adult supervision.
- Avoid thorny, poisonous or strongly irritant plants in areas likely to be used by children.
- Place plants securely and water them in.
- Remove loose trays, labels, pots and packaging.
14. Watering
- Use manageable watering cans or containers.
- Avoid carrying heavy water loads long distances.
- Do not leave hoses trailing across paths.
- Take care on wet or slippery surfaces.
- Avoid creating puddles on paths.
- Coil hoses and store equipment safely after use.
15. Ongoing maintenance
Maintenance may include weeding, deadheading, watering and replacing plants.
Volunteers should:
- wear gloves
- work in pairs or groups where possible
- keep tools off paths
- avoid heavy lifting alone
- report damage, instability, vandalism or unsafe conditions
- stop if the weather or ground conditions become unsafe
- leave the area tidy after each visit
If a barrel becomes unstable, damaged or unsafe, volunteers should not attempt major repairs unless agreed. The issue should be reported to the organiser and, where appropriate, the Council.
16. End-of-session check
At the end of each session, the organiser or nominated volunteer should check that:
- all tools have been collected
- paths are clear
- no bags, pots, ties or plastic waste remain
- the barrel is stable
- no sharp objects or trip hazards have been left
- any incidents or concerns have been recorded
- volunteers have safely left the site
17. Volunteer briefing checklist
Before each organised session, the organiser should remind volunteers:
- Wear gloves and sturdy footwear.
- Only do tasks you feel comfortable doing.
- Ask for help with heavy items.
- Keep tools and materials away from paths.
- Watch out for pedestrians, cyclists, children and dogs.
- Wear hi-viz near paths, entrances or vehicle access points.
- Do not pick up needles, chemicals, dog mess or unknown items.
- Stop if something seems unsafe.
- Report accidents, hazards or near misses to Corstorphine in Bloom
- In an emergency, call 999.
18. Exclusions
The following are not covered by this RAMS and require separate agreement or assessment:
- work on live roads
- traffic management
- excavation or digging into unknown ground
- use of power tools
- chainsaws, strimmers or machinery
- working at height
- moving very heavy planters once filled
- installation requiring fixings, anchoring or construction work
Summary
This activity is low to medium risk when properly organised. The main risks are manual handling, trips, public interaction, planter stability and working near paths or vehicle access points. These risks can be controlled by keeping barrels empty while moving them, using team lifting, keeping public routes clear, wearing gloves and hi-viz where needed, and stopping work if conditions become unsafe.
Core message:
Please only do work you feel comfortable with. If in doubt, stop and ask.
You may want to add a simple site-specific appendix for each park showing exact planter positions, especially where barrels are close to paths, entrances, play areas or maintenance vehicle routes.
